ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

  1. (-FY2017) Aid Strategies
  2. Revisiting the Capacity Development Approach through Comparative Case Analysis

A Fresh Look at Capacity Development from Insiders’ Perspectives:A Case Study of an Urban Redevelopment Project in Medellín,Colombia

https://doi.org/10.18884/00000663
https://doi.org/10.18884/00000663
d9584cf0-26a2-42dd-9042-3884c69ba546
名前 / ファイル ライセンス アクション
JICA-RI_WP_No.60_2013_2.pdf JICA-RI_WP_No.60_2013_2.pdf (1.0 MB)
license.icon
Item type 報告書 / Research Paper(1)
公開日 2013-03-29
タイトル
タイトル A Fresh Look at Capacity Development from Insiders’ Perspectives:A Case Study of an Urban Redevelopment Project in Medellín,Colombia
言語
言語 eng
キーワード
主題Scheme Other
主題 Capacity Development
キーワード
主題Scheme Other
主題 urban redevelopment
キーワード
主題Scheme Other
主題 social urbanism
キーワード
主題Scheme Other
主題 Medellín
キーワード
主題Scheme Other
主題 Colombia
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_18ws
資源タイプ research report
ID登録
ID登録 10.18884/00000663
ID登録タイプ JaLC
報告年度
日付 2013-03-29
日付タイプ Issued
著者 Sato, Mine

× Sato, Mine

WEKO 767

en Sato, Mine

Search repository
抄録
内容記述タイプ Abstract
内容記述 In contrast to the current discussion on Capacity Development (CD), which is mostly made from the donors’ aid-effectiveness point of view, this paper attempts to explore what foreign donors can learn about CD by tracing the endogenous and long-running CD process from insiders’ perspectives. As a case study, an urban redevelopment project called MIB in Medellín City in Colombia is examined. After clarifying the initial context of urban poverty in Colombia, the paper traces the six phases of the MIB project: institutional preparation and awareness enhancement, conception of the inclusive-urbanism idea, planning of the MIB, construction/reconstruction of the residences, resettlement of residents, and scaling-up. Then the paper makes an in-depth analysis of the whole process, focusing on five key CD factors identified by Hosono et al. (2011): stakeholder ownership, mutual learning, specific drivers, scaling-up, and roles of external actors. From the analysis, the paper proposes four major lessons on CD research and practice in the future. First, we need to change our timeframe through which we look at the CD process. The MIB experience shows that the process can be far longer than what has been assumed by donors and researchers. Second, the current project-centered periodization of development assistance and the overwhelming focus on the project period should be reconsidered. In the MIB, the project implementation phase took only five years in a total process of 30 years. Third, the MIB case shows that documentation of previous projects and seminars, which occur in the pre-project phase under donors’ auspices, can greatly help local specialists conceive of new ideas. Fourth, the post-project phase also merits greater attention in identifying constraints to sustainability and replicability of the project concerned and to explore what external actors can do to overcome the constraints. The paper concludes by pointing out the necessity of accumulating similar kinds of case studies on the CD process made from insiders’ perspectives.
号
号 Working Paper;60
戻る
0
views
See details
Views

Versions

Ver.1 2023-05-15 13:11:00.662165
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3